Building a First Home › What is the step-by-step process of building a house?

What is the step-by-step process of building a house?

At a high level: get your finance pre-approved, choose your land and a licensed builder, finalise the design and a fixed price contract, obtain council or certifier approval, then build through staged construction, site prep, slab, frame, roof, lock up, fix out and completion, with your lender paying the builder at each stage. It finishes with a final inspection, handover, and a defects period.

Ross McFarlaneWritten by Ross McFarlane, Licensed Mortgage Broker (Credit Representative 526725). About the author

Building a house has a lot of moving parts, and the overwhelm usually comes from not seeing the whole journey laid out in order. So here is the process from start to finish at a high level, so you know what happens when, and crucially, what to do first.

Step 1: Get your finance sorted first

Before anything else, get your finance assessed and obtain a conditional pre-approval. This tells you your real budget and stops you committing to land or a build you cannot finance. It is the single most important first step, and doing it before you fall for a design or estate saves heartache. A broker can set your budget and confirm which low deposit options and grants you qualify for.

Step 2: Choose your land and builder

Next, choose where you will build, a lot in a new estate or your own block, and choose a licensed builder. This is a big decision: check the builder is licensed, has the required warranty insurance, and has a track record you can verify. Whether you go with a house and land package or your own block and builder shapes much of what follows.

Step 3: Finalise the design and a fixed price contract

With your builder chosen, you finalise the design and inclusions and sign a fixed price building contract. This locks in the price, the inclusions, the progress payment schedule and a construction timeframe. Read it carefully, understand the variations and provisional sums, and ideally have it reviewed before you sign, because this contract governs your whole build.

Step 4: Approvals and pre-construction

Before building begins there is a pre-construction phase: a soil test, a site survey, structural engineering, and approval, either through a faster certifier pathway or a council development application. This phase can take a few months, and it is where many timelines quietly slip, so it is worth keeping things moving with prompt decisions.

Step 5: From pre-approval to a construction loan

Your finance now moves from pre-approval to a formal construction loan. For a package, the land settles first once its title is registered. The lender values the home on completion, as if finished, and sets up the staged construction loan. This is where the on completion valuation matters, since it determines how much the lender will advance.

Step 6: The build stages

Construction then runs through a sequence of stages, commonly site preparation, slab or footings, frame, roof, lock up, fix out, completion and handover. As your builder finishes each stage they invoice, you authorise it, and your lender releases a progress payment. You pay interest only on what has been drawn during this period, so your repayments build up alongside the house.

Step 7: Final inspection and handover

As the build finishes there is a final inspection to check the work is complete and compliant, and the relevant occupancy approval is issued. Your lender will generally need proof the completed home is insured before the final payment is released. Then comes handover, when you receive the keys to your new home.

Step 8: The defects and maintenance period

Building does not quite end at handover. There is usually a defects liability or maintenance period after you move in, during which you can report any defects or unfinished items and the builder is responsible for rectifying them. Keeping a list and reporting issues promptly within this period is how you make sure small problems get fixed.

How long it all takes

From the first step to the keys, this whole process realistically takes many months, often around 9 to 18 months once approvals and the build are counted. Going in with that expectation, and a broker to keep the finance aligned at each stage, turns a daunting process into a series of manageable steps.

In our experienceThe mistake we see most is people doing the steps out of order, falling in love with a design or estate before they know their budget. Get the finance assessed first, choose a solid builder second, and treat the fixed price contract as the document that governs everything. Do those three right and the rest follows.
Free, no obligation

Thinking about building your first home?

Answer a few quick questions and we can help you set a realistic budget, check which grants and schemes you qualify for, and map out the path, at no cost and no obligation.

Check Your Options

A few quick questions, no obligation.

What is your goal?

Tell us a bit more about the plan

How do you earn your income?

How is your credit score?

This helps us match you to the right lender from the start.

Last step. Where should we send your options?

Your information is private and we will never share it.

By submitting, you agree to be contacted by one of our team of licensed mortgage brokers. No obligation. No spam.

You're all set.

We've received your details. One of our friendly brokers will reach out within 1 business day to help guide you through your options.

Frequently asked questions

What is the first step in building a house?▾

Getting your finance assessed and obtaining a conditional pre-approval, before you commit to land or a build. It tells you your real budget and is the single most important first step.

What are the stages of construction?▾

Commonly site preparation, slab or footings, frame, roof, lock up, fix out, completion and handover. Your builder invoices at each stage and your lender releases a progress payment once it is done.

What happens after handover?▾

There is usually a defects liability or maintenance period during which you can report defects or unfinished items, and the builder is responsible for rectifying them. Report any issues promptly within that period.

Last reviewed: June 2026

General information only. This page provides general information about home loans and is not financial or credit advice, a quote, or a guarantee, and your personal circumstances have not been considered. Lending policies, interest rates, fees and eligibility vary by lender and change over time. Always confirm your own situation with a licensed mortgage broker or lender before acting. Ross McFarlane (Credit Representative 526725) is an authorised Credit Representative of Australian Associated Advisers Pty Ltd t/a Keylend, Australian Credit Licence 392169.